Manufacturing Operations & Work Center Control

Setup MRP production routes, Work Center schedules, and Gantt charts parameters for casting workshops.

Transform raw inventory orders into finished goods utilizing structured Material Requirements Planning (MRP) cycles. Set capacity parameters across casting workstations, benches, and assembly centers.

1. Work Center Setup

Register workstations with specific shifts, efficiency ratings, and capacity limits. Work center setups compute labor rates and routing schedules for automated order logs.

Work CenterAvg Capacity (Hours/Day)Shift RotationsEfficiency Rating (%)
Melting & Casting Bay16 hrs2 Rotations95.00%
Sprue Cutting Bench8 hrs1 Rotation98.00%
Finishing & Polishing24 hrs3 Rotations90.00%
Robotic Quality Check24 hrsContinuous99.99%

2. Setting Up MRP Requisition Cycles

MRP planning runs calculate target production orders based on order volumes and safety stock levels. System triggers automatically compile purchase requisitions when parts stocks dip below safety points.

Automated MRP scheduling eliminates production bottlenecks. Connecting work center logs to materials ledgers cuts manual planning cycles by over 70%.

3. Gantt Scheduling Integration

Production schedules display on an interactive Gantt chart. Drag-and-drop actions let managers allocate tasks to alternate machines if maintenance flags are triggered, preventing assembly lines bottlenecks.